Governance
Who owns security outcomes, which frameworks apply, and what the infrastructure has to prove: strategy, policy, accountability, risk and assurance, plus how ISO/IEC 27001, NIST CSF 2.0 and SP 800-53, CISA CPG, SOC 2, HIPAA, PCI DSS and CMMC shape data center design.
What it is
Governance decides what the build must achieve and who answers for it: which security objectives follow from business goals, which laws, contracts and frameworks apply, who accepts the risk that remains, and what evidence shows the controls work. These are design inputs. Compliance scope is set at step 1 of the build journey with the capacity envelope, because it changes the segmentation model, log retention, encryption, backup testing and what you need from a colo provider.
This page treats frameworks as requirements on the infrastructure and links to the pages that implement them. Physical access, firewalls, segmentation, identity and OT controls are on Security. Resilience ratings and colo evaluation are on Facility. Immutability, retention and restore testing are on Backup. Monitoring and the change process are on Ops.
Not legal advice. This is design guidance, not legal advice or a compliance determination. Whether a framework applies to you, and whether a design satisfies it, is for your counsel, your assessor or auditor, and the regulator or contracting party. Framework versions and dates were checked on 6 Oct 2026; items marked Verify change often.
Key subclasses
Strategic direction
Security objectives tied to business goals and risk appetite, and compliance scope set before the design is fixed. Strategy →
Policies and standards
Policy, standard and procedure hierarchy, and the infrastructure decisions each layer must cover. Policies →
Roles and accountability
Outcome ownership that stays with executives and the board, the operational work delegated below them, RACI, and colo shared responsibility. Roles →
Risk management
Risk register, scoring, treatment and formal acceptance by the risk owner. Risk →
Oversight and assurance
Continuous monitoring, audits, metrics, and the evidence the infrastructure must produce. Assurance →
Frameworks and design mapping
What each in-scope framework is and what it asks of the data center. Frameworks → · Design mapping →
Design / build / manage
Design
- Set compliance scope and the regulated-data boundary at step 1 (Strategy)
- Approve policy; set the standards before the build team has to pick values (Policies)
- Name the risk owner, approve the RACI; colo: agree the responsibility matrix before signing (Roles)
- Build the requirements register and hand each requirement to the owning page (Design mapping)
- Confirm which frameworks and versions apply (Frameworks)
Build
- Write the procedures and runbooks the build depends on before cutover (Policies)
- Capture build evidence; test segmentation and restores before go-live (Assurance)
- Open the risk register with design-time residual risks and pre-go-live gaps (Risk)
Manage
- Run the evidence calendar and report metrics to the risk owner (Assurance)
- Re-review risk acceptances on expiry or significant change (Risk)
- Track framework changes; the items marked Verify move fastest (Frameworks)
Related comparisons
Sections on this page and the pages that hold the detail.
Strategic direction
Tie security objectives to business goals and set compliance scope before the design is fixed. Sources: NIST CSF 2.0 (CSWP 29, 26 Feb 2024) Govern function; ISO/IEC 27001:2022 public abstract. Sources checked 6 Oct 2026.
Objectives from business goals
CSF 2.0 added a Govern function that sits above Identify, Protect, Detect, Respond and Recover. It asks for an understood mission and stakeholder expectations (GV.OC), a risk management strategy with risk appetite and tolerance statements (GV.RM-02), and cyber risk handled inside enterprise risk management (GV.RM-03) (NIST CSWP 29). For a data center the useful outputs are a short list of objectives that the infrastructure can be designed and measured against, for example:
- Which services are tier-1, with the RPO and RTO the business accepts (feeds Backup: RPO and RTO)
- Which regulated data the site will hold, and whether it may sit in colo or must stay onsite
- How much downtime from a facility fault is tolerable (feeds the resilience decision on Facility)
- Which customers or contracts require attestations, and which ones
Set compliance scope early
CSF GV.OC-03 asks that legal, regulatory and contractual cybersecurity requirements are understood and managed. In a build, that means a scope statement at step 1 that names each framework, the systems and data it covers, and who confirmed it (legal, compliance, the contracting party). Scope drives design in four ways:
| Scope decision | What it changes downstream | Owner of the implementation |
|---|---|---|
| Regulated-data boundary (cardholder data environment, ePHI systems, CUI enclave) | Zones and inspection points in the segmentation model; which systems the audit covers. A tight boundary keeps the assessment small; a flat network brings everything into scope. | Security: Segmentation |
| Retention periods | SIEM and log storage, VMS recorder storage, access-record retention | Security: Log retention and protection · Video |
| Recovery and test obligations | Backup copy design, restore-test cadence, DR site | Backup: DR |
| Third-party requirements | Colo selection, contract clauses, which provider reports you need | Facility: Colo evaluation |
The reference scenario (A11 in the build journey assumptions) assumes a general enterprise posture such as ISO/IEC 27001 with no special regulated enclave. If a regulated enclave is added later, revisit the segmentation model and retention first; both are expensive to change once the fabric and storage are built.
Strategy design / build / manage
Design
- Write the scope statement at step 1: frameworks, systems and data in scope, who confirmed each, and the regulated-data boundary (Scope early)
- Agree the objectives the design is measured against: tier-1 services with RPO/RTO, where regulated data may sit, tolerable facility downtime, required attestations
- Feed RPO/RTO to Backup and the downtime tolerance to Facility; the boundary and retention go out with the requirements register (Requirements register)
Build
- Before go-live, confirm the built boundary matches the scope statement and retention matches the requirements register, as part of the pre-go-live control check. Fix the difference, update the scope, or record it as a risk with an owner. For PCI DSS this is the first 12.5.2 scope confirmation.
Manage
- Review the strategy and objectives at least yearly and after major change
- If a regulated enclave is added later, revisit the segmentation model and retention first
Policies and standards
The document hierarchy and the infrastructure decisions it must cover. Sources: NIST CSF 2.0 GV.PO-01 and GV.PO-02; ISO/IEC 27001:2022 Annex A 5.1; NIST SP 800-88 Rev. 2. Sources checked 6 Oct 2026.
Hierarchy
CSF 2.0 GV.PO-01 and GV.PO-02 ask for policy that is established, communicated and enforced, and reviewed as requirements, threats and technology change. ISO/IEC 27001:2022 Annex A 5.1 covers policies for information security.
| Layer | Says | Approved by | Changes | DC example |
|---|---|---|---|---|
| Policy | What must be true and who is accountable | Executive management or the board | Rarely; reviewed on a set cycle | “Regulated data is isolated from other systems and every crossing is inspected and logged.” |
| Standard | The specific, measurable requirement | CISO or security governance forum | When technology or requirements change | Zone list and inter-zone matrix; minimum TLS versions; log retention periods (Security: Log retention); sanitization method by media type |
| Procedure / runbook | How a team carries it out, step by step | Owning team lead | Often | Firewall rule change; drive destruction with certificate; quarterly restore test |
| Exception | A time-bound deviation with compensating controls | The risk owner (see Risk acceptance) | Expires; re-reviewed | Legacy BMS controller that cannot take MFA, isolated in its own OT zone |
Decisions the documents must cover
Each row is a decision the infrastructure teams cannot make alone. If no standard exists, the build team will choose a value and the auditor will ask who approved it.
- Physical access: zones, who approves access, review interval, visitor and escort rules, retention of access records and video (Security: Physical)
- Segmentation: trust zones and what may cross between them (Security: Policy model)
- Cryptography and keys: where data must be encrypted at rest and in transit, approved algorithms and modules, key custody and rotation (Storage: Encryption · Security: Key management)
- Privileged access: admin identities, MFA, session recording, break-glass (Security: Identity)
- Logging: sources, time sync, retention, who reviews, protection of logs (Security: Log sources and volume · Security: Log retention and protection · Security: Time sync · Ops: Monitoring)
- Backup and recovery: copies, immutability, RPO/RTO, restore-test cadence (Backup)
- Change: what needs approval, emergency changes, post-change verification (Ops: Change management)
- Media and equipment disposal: sanitize or destroy, method by media type, certificates, chain of custody
- Suppliers and colo: required attestations, right to audit, incident notice, responsibility matrix
NIST SP 800-88 Rev. 2 (September 2025) is the current NIST guideline for media sanitization programs and is the usual reference for the disposal standard (NIST SP 800-88r2).
Policies design / build / manage
Design
- Get policy approved by executive management or the board; set the standards below it before the build team has to pick values
- Cover each decision in Decisions the documents must cover, including a disposal standard based on NIST SP 800-88 Rev. 2
Build
- Write the procedures and runbooks the owning teams need before cutover: access, crypto and keys, logging, change, backup, media disposal
- Route deviations found during the build through the exception process, with compensating controls and an expiry (Risk acceptance)
Manage
- Review policy at least yearly and when requirements, threats or technology change; update standards when they do
- Re-review exceptions on expiry
Roles and accountability
Who owns the outcome, who does the work, and how that splits with a colo provider. Sources: NIST CSF 2.0 GV.RR; NIST SP 800-53 Rev. 5 (release 5.2.0) PM-2, PM-9 and CA-6; AICPA TSC CC1.2 and CC1.3; HIPAA 45 CFR 164.308(a)(2); PCI DSS v4.0.1 Req. 12.4.1 and 12.8.5; 32 CFR 170.19. Sources checked 6 Oct 2026.
Outcome ownership vs operational tasks
Frameworks separate accountability for the outcome from the work of running controls. Accountability stays with executive management or the board; the tasks can be delegated to security, infrastructure and providers.
- NIST CSF 2.0 GV.RR-01: organizational leadership is responsible and accountable for cybersecurity risk. GV.RR-03 adds adequate resources for the strategy.
- NIST SP 800-53 CA-6: a senior official is the authorizing official who accepts inherited common controls and authorizes a system to operate. PM-2 appoints a senior information security officer to run the program.
- ISO/IEC 27001:2022: top management must show leadership and commitment to the ISMS and assign roles; Annex A 5.2 and 5.4 cover roles and management responsibilities. Verify clause wording against a licensed copy.
- SOC 2 (TSC CC1.2, CC1.3): CC1.2: the board demonstrates independence from management and exercises oversight of internal control. CC1.3: management, with board oversight, sets structures, reporting lines, authorities and responsibilities. These bind only if the organization issues its own SOC 2 report.
- HIPAA 164.308(a)(2): identify one security official responsible for the security policies and procedures.
- PCI DSS v4.0.1 Req. 12.4.1 (service providers only): executive management establishes responsibility for protecting cardholder data and for the PCI DSS compliance program.
- CISA CPG 2.0 goal 1.A: cybersecurity roles and responsibilities are documented, with C-suite and both physical and cyber security staff in scope, and IT/OT teams working together.
What cannot be delegated: setting risk appetite, accepting residual risk, approving policy, and funding the program. A provider or an infrastructure team can run a control, but cannot accept the risk of it failing on the organization’s behalf.
RACI for DC control areas
A starting point to adapt. R = responsible (does the work), A = accountable (one per row, owns the outcome), C = consulted, I = informed. “Exec” is the executive risk owner (often a CIO, COO or CRO, with the board informed); “CISO” is the security function.
| Activity | Exec / board | CISO | Infra / DC team | Ops | Colo provider |
|---|---|---|---|---|---|
| Risk appetite, policy approval | A | R | C | C | – |
| Compliance scope statement | A | R | C | I | I |
| Segmentation model and firewall policy | I | A | R | C | – |
| Physical access to building and hall | I | A | R (onsite) | C | R (colo) |
| Authorized access list for cage or cabinets | – | A | R | I | R (enforces the list) |
| Logging and log review | – | A | R (sources) | R (monitoring) | R (its own systems) |
| Backup and restore testing | I | C | A / R | R | – |
| Change control | – | C | R | A | I (facility changes notified) |
| Media sanitization and disposal | – | A | R | C | – (or R if it runs disposal) |
| Residual risk acceptance | A | R (recommends) | C | C | – |
In colo, accountability for physical access stays with you even where the provider runs the layer; its share is evidenced through its attestations and the responsibility matrix (Colo shared responsibility). The split in this table is editorial practice, not taken from any one framework. Where a framework names a role (the HIPAA security official, the 800-53 authorizing official), map it to a named person in the A column.
Colo shared responsibility
In colo the provider runs the building, power, cooling and much of physical security, so some controls you are assessed on are its controls. The frameworks handle this in different ways, but the common design need is the same: a written responsibility matrix and evidence for the provider’s share. The layer-by-layer physical split is on Security: Onsite vs colo, and what to ask for when evaluating a provider is on Facility: Colo evidence.
| Framework | How provider controls are handled |
|---|---|
| PCI DSS v4.0.1 | Req. 12.8.2: written agreements with each third-party service provider (TPSP) that can affect the security of the CDE. Req. 12.8.4: monitor each TPSP’s PCI DSS compliance status at least every 12 months. Req. 12.8.5: keep a record of which requirements each TPSP manages, which you manage, and which are shared. (Req. 12.9.1–12.9.2 are the matching obligations on the provider.) Physical requirements under Req. 9 that the colo meets need its evidence, typically its own attestation of compliance or inclusion in your assessment. |
| ISO/IEC 27001:2022 | Annex A 5.19–5.22: supplier relationships, security in supplier agreements, ICT supply chain, and monitoring of supplier services. The provider’s ISO/IEC 27001 certificate helps if its scope names your site. |
| NIST SP 800-53 Rev. 5 | SA-9 (external system services) and inherited common controls, which the authorizing official accepts under CA-6. CSF GV.SC-05 puts the requirements in contracts. |
| SOC 2 | CC9.2: the entity assesses and manages vendor and business-partner risk. If you issue your own SOC 2, the colo is typically treated as a subservice organization (management and your service auditor decide), presented by the carve-out or the inclusive method (see below). If you only consume the provider’s report, it is evidence for the supplier controls the other frameworks require. |
| HIPAA | 164.308(b): business associate contracts. Whether a colo with physical-only access needs a business associate agreement depends on the facts; decide with counsel. Verify |
| CMMC (32 CFR 170.19) | A provider is an External Service Provider only if CUI or security protection data (such as logs or configuration) is on its assets. ESP use goes in your system security plan and the ESP’s customer responsibility matrix. A space-and-power colo that handles neither may not be an ESP, but its physical controls still bear on 800-171 3.10.x for your in-scope assets. Verify with your assessor. |
Using a colo provider’s SOC 2 Type 2 report
A provider’s SOC 2 Type 2 report is the usual evidence for its share of physical and environmental controls. It informs supplier due diligence (PCI DSS Req. 12.8.3) and ISO/IEC 27001 Annex A 5.19–5.22 monitoring. It is not a PCI DSS Attestation of Compliance (AOC) and does not show PCI DSS compliance status for Req. 12.8.4. For Req. 9 controls the provider runs, you need the provider’s AOC or its inclusion in your assessment (see the table above). Confirm with your QSA. Verify Read the report, don’t just file it:
| Check | What to look for |
|---|---|
| Type and period | Check it is a SOC 2, not a SOC 1 (controls relevant to financial reporting) or a SOC 3 (general-use summary with no test results). Type 2, not Type 1: only Type 2 tests operating effectiveness. Note the period start and end dates; a period that ended long ago says little about today. |
| Scope | The system description names your site, building or hall, and the services you buy (space, power, cooling, physical security, remote hands). Check which trust services categories are included; Availability (A1) is optional and often matters most for a colo. If it is in scope, A1.1 (capacity) bears on power and cooling headroom. |
| Subservice organizations | Carve-out method: the subservice organization’s controls (for example a security-guard contractor or the building owner) are excluded from testing, and the report lists the complementary subservice organization controls it assumes they run; get evidence for those separately. Inclusive method: those controls are described and tested in the report. |
| Complementary user entity controls | The controls the provider assumes you operate, such as keeping your authorized access list current, reviewing access reports and escorting your vendors. Map each one to an owner in your RACI and keep evidence; the provider’s controls only work together with them. |
| Exceptions and opinion | Read the test results for deviations, especially on physical access (CC6.4), environmental and recovery controls (A1.2, A1.3, if Availability is in scope) and change (CC8.1), and the management responses. Exceptions in the test results do not always change the opinion. A qualified, adverse or disclaimed opinion means the auditor found a material problem with the description, the design, or operating effectiveness, or could not complete the work. Read the basis-for-modification paragraph. Record material exceptions as supplier risks in the risk register. |
| Bridge letter | For the gap between the period end and today, the provider can issue a bridge (gap) letter. It is a statement signed by the provider’s management, not the auditor, that controls have not changed materially; the auditor performs no procedures on the gap and gives no assurance over it. Common practice treats a bridge letter as covering a gap of up to about three months. For longer gaps, ask for the next report or an interim one. Verify |
An ISO/IEC 27001 certificate is the other common provider evidence. It shows a certified ISMS and its scope, but it has no test results; a SOC 2 Type 2 report shows what was tested and what failed. Facility ratings are separate evidence (Facility: Colo evidence). How carve-out, CUECs and bridge letters are described here follows CPA-firm guidance on the AICPA SOC 2 guide, which is paywalled. Verify
Roles design / build / manage
Design
- Name the executive risk owner and, where a framework requires one, the security official or authorizing official
- Adapt the RACI with one A per row
- Colo: agree the responsibility matrix and get the provider’s attestations before signing (Colo shared responsibility)
Build
- Map each complementary user entity control in the provider’s SOC 2 report to an owner in the RACI
- Colo: file the provider’s attestations and the signed responsibility matrix with your evidence; for CMMC, record any ESP use in the system security plan
Manage
- Collect and read the provider’s SOC 2 Type 2 report each cycle: period, scope, subservice organizations, CUECs, exceptions, bridge letter (Using a colo SOC 2)
- Update the RACI and the CUEC owner mapping when people, providers, control areas, or the CUECs in the provider’s latest report change (editorial practice; no framework sets a cadence)
Risk management
Identify, prioritize, treat and formally accept risk. Sources: NIST CSF 2.0 GV.RM and ID.RA; NIST SP 800-53 Rev. 5 RA-3, PM-9, CA-5; HIPAA 164.308(a)(1); PCI DSS v4.0.1 Req. 12.3.1; ISO/IEC 27001:2022 public abstract. Sources checked 6 Oct 2026.
Process the frameworks share
Most of the in-scope frameworks expect a documented risk assessment that drives control choices; PCI DSS v4.0.1 uses targeted risk analyses for specific requirements, and CSF is voluntary. HIPAA makes risk analysis and risk management required specifications (164.308(a)(1)(ii)(A)–(B)). NIST SP 800-53 has RA-3 for risk assessment and PM-9 for an organization-wide strategy. ISO/IEC 27001 builds the ISMS on risk assessment and treatment, recorded in a Statement of Applicability. PCI DSS v4.0.1 Req. 12.3.1 requires a documented targeted risk analysis wherever you choose your own frequency for a requirement, reviewed at least every 12 months. CSF ID.RA-06 asks that risk responses are chosen, tracked and communicated, and GV.RM-06 asks for one standard method to score risk.
| Step | DC-specific inputs |
|---|---|
| Identify | Asset inventory including OT (BMS, EPMS, PACS, UPS and PDU cards), data-flow maps, single points of failure from the facility design, suppliers |
| Analyze | Likelihood and impact on one scale (GV.RM-06). Include facility risks (loss of cooling, utility outage) beside cyber risks, since both reach the same services. |
| Treat | Mitigate (a control on another page), transfer (contract or insurance), avoid (don’t place the workload here), or accept |
| Record | Risk register: owner, score, treatment, due date, residual score, link to evidence. Plans of action for open gaps (800-53 CA-5). |
Risk acceptance
- Only the accountable executive accepts residual risk above the agreed tolerance; the security team recommends
- Each acceptance names the risk, the compensating controls, the owner and an expiry date
- Design trade-offs are risk acceptances too: an onsite room left N+1 with single points of failure (Facility: Availability gap), or a legacy OT device that cannot be patched (Security: OT). Record them at design time, not after the audit finds them.
- Re-review on expiry, on a significant change, or when a framework moves a requirement from best practice to mandatory
Risk design / build / manage
Design
- Agree one scoring method and score facility and cyber risks on the same scale
- Record design trade-offs as risk acceptances at design time, with owner, compensating controls and expiry
Build
- Open the risk register with the residual risks from design decisions and the gaps from the pre-go-live control check (Design mapping: pre-go-live check), and get them accepted by the accountable executive
- Open plans of action for gaps that will be closed later (CMMC: POA&M eligibility and 180-day closeout per 32 CFR 170.21) Verify
Manage
- Re-review acceptances on expiry, on significant change, or when a framework moves a requirement from best practice to mandatory
- Review PCI DSS targeted risk analyses (Req. 12.3.1) at least every 12 months
- Record material exceptions in provider reports as supplier risks
Oversight and assurance
Continuous monitoring, periodic audit, metrics, and the evidence the infrastructure must produce. Sources: NIST CSF 2.0 GV.OV and PR.PS-04; NIST SP 800-53 Rev. 5 CA-2, CA-7, PM-31; CISA CPG 2.0 goals 1.B and 3.Q; PCI DSS v4.0.1 Req. 10.7.2, 11.4.5, 12.5.2; HIPAA 164.308(a)(8). Sources checked 6 Oct 2026.
Continuous monitoring and periodic audit
Continuous. NIST SP 800-53 CA-7 asks for a monitoring strategy with defined metrics, monitoring frequencies and ongoing control assessments; PM-31 sets it at organization level. PCI DSS v4.0.1 Req. 10.7.2, mandatory for all entities since 31 March 2025, requires that failures of critical security controls are detected, alerted and addressed promptly, and the list includes physical access controls, segmentation controls and audit logging. Design the monitoring so that a dead camera, a stopped log feed or a bypassed firewall raises an alert, not just an attack. The tooling is on Ops: Monitoring.
Periodic. HIPAA 164.308(a)(8) requires periodic technical and nontechnical evaluation. ISO/IEC 27001 requires internal audit and management review, plus external audits for certification. NIST SP 800-53 CA-2 covers control assessments. PCI DSS validation is annual, through a Report on Compliance or a Self-Assessment Questionnaire with an Attestation of Compliance, depending on brand and acquirer rules.
Metrics for the risk owner
CSF GV.OV-01 to GV.OV-03 ask that strategy outcomes and risk management performance are reviewed and used to adjust direction. Report a short set that maps to the risks the executive accepted:
- Restore tests: share passed, and achieved RPO/RTO against target (Backup: Restore testing)
- Patch latency for internet-facing and known-exploited vulnerabilities (Security: Lifecycle)
- Access reviews completed on time; leavers removed within the target; physical access exceptions
- Log source coverage: share of in-scope systems sending logs, and outage minutes of the log pipeline
- Open risk acceptances, and how many have expired
- Audit findings open by age; supplier attestations current
Evidence the infrastructure must produce
Assessors test records, not intentions. Build these outputs into the design so they exist without a scramble before each audit.
| Evidence | Typical requirement driving it | Produced by |
|---|---|---|
| Asset inventory and network / data-flow diagrams | CSF ID.AM-01, ID.AM-03; 800-53 CM-8; PCI DSS 12.5.2 (scope confirmed every 12 months); CMMC asset categories in the SSP (32 CFR 170.19); CISA CPG 2.0 goals 2.A, 2.E | DCIM and CMDB (Ops: DCIM) |
| Physical access logs, visitor logs, video | 800-53 PE-3, PE-6, PE-8; PCI DSS 9.2.1.1, 9.3.4; 800-171 3.10.4 | PACS and VMS (Security: Physical monitoring) |
| Security and admin logs with synchronized time | 800-53 AU-2, AU-8, AU-11, AU-12, SC-45; PCI DSS 10.5.1, 10.6.1; HIPAA 164.312(b); 800-171 3.3.1, 3.3.7; CPG 3.Q | SIEM (Security: Log sources and volume · Security: Log retention and protection · Security: Time sync); review and alerting on Ops: Monitoring |
| Segmentation test results | PCI DSS 11.4.5 (every 12 months and after changes; 11.4.6 every six months for service providers) | Penetration test against the policy model |
| Restore and DR test records | 800-53 CP-4, CP-9; HIPAA 164.308(a)(7); CSF PR.DS-11; CPG 3.O | Backup: Restore testing |
| Change records with approvals | 800-53 CM-3; PCI DSS 6.5.1–6.5.2; 800-171 3.4.3; CPG 3.N | Change system (Ops: Change evidence) |
| Sanitization and destruction certificates | 800-53 MP-6; PCI DSS 9.4.7; HIPAA 164.310(d)(2)(i)–(ii); 800-171 3.8.3 | Disposal procedure and vendor |
| Provider attestations and responsibility matrix (SOC 2 Type 2 report, bridge letter, CUEC mapping) | PCI DSS 12.8.2, 12.8.4 (for PCI: provider AOC), 12.8.5; ISO 27001 A.5.19–5.22; 800-53 SA-9; SOC 2 CC9.2; CMMC ESP CRM (Using a colo SOC 2) | Supplier management (Facility: Colo contract) |
| Risk register, acceptances, policy approvals | CSF GV.RM, GV.PO; HIPAA 164.316(b) (6-year documentation retention) | Governance (this page) |
Assurance design / build / manage
Design
- Design monitoring so a control failure raises an alert: a dead camera, a stopped log feed, a bypassed firewall (Ops: Monitoring)
- Build the outputs in Evidence the infrastructure must produce into the design
- Choose metrics that map to the risks the executive accepted (Metrics)
Build
- Collect build evidence as you go: diagrams, inventory, configuration baselines, test results, acceptance sign-offs
- Test segmentation (PCI DSS 11.4.5; 11.4.6 for service providers) and restores before go-live and keep the results as audit evidence
Manage
- Run the evidence calendar: PCI DSS scope confirmation every 12 months (12.5.2; every six months for service providers, 12.5.2.1), segmentation tests every 12 months (11.4.5; every six months for service providers, 11.4.6), restore tests, access reviews, supplier reports
- Report metrics to the risk owner on a set cadence
- Run internal audit and management review, and the periodic evaluations the frameworks in scope require
Frameworks compared
The in-scope frameworks: what each is, who it applies to, how conformance is shown, and the current version. ISO standards are paywalled, so ISO facts come from ISO’s public pages and certification-body summaries. SOC 2 facts come from the AICPA Trust Services Criteria (TSP section 100); the AICPA SOC 2 guide is paywalled. Other frameworks (FedRAMP, COBIT, GDPR, NIS2, DORA) are not covered here. Sources checked 6 Oct 2026.
| Framework | What it is | Applies to | How conformance is shown | Current version and key dates |
|---|---|---|---|---|
| ISO/IEC 27001:2022 and 27002:2022 | 27001: requirements for an information security management system, with 93 Annex A reference controls in four themes (organizational 37, people 8, physical 14, technological 34). 27002: guidance for those controls; not certifiable. | Any organization; voluntary unless a customer or contract requires it | Third-party certification by an accredited certification body (27001 only) | 27001:2022 published 25 Oct 2022; Amd 1:2024 (climate action) Feb 2024. 2013 certificates expired by 31 Oct 2025. No newer edition found. Verify |
| NIST CSF 2.0 | Outcome taxonomy in six functions: Govern (new in 2.0), Identify, Protect, Detect, Respond, Recover. Does not prescribe how outcomes are achieved. | Any organization; voluntary | Self-assessment with current and target profiles; no certification | CSWP 29, 26 Feb 2024. No 2.x revision found. |
| NIST SP 800-53 Rev. 5 | Control catalog (security and privacy); baselines in SP 800-53B | Mandatory for US federal systems; widely used elsewhere as a control catalog | Federal: assessment and authorization by an authorizing official. Elsewhere: self or third-party assessment. | Release 5.2.0, 27 Aug 2025 (added SA-15(13), SA-24, SI-2(7)). No Rev. 6 found. Verify |
| CISA Cross-Sector CPG | A short set of high-impact baseline practices for IT and OT, mapped to CSF 2.0 | Critical infrastructure owners and operators, especially small and medium; voluntary | Self-assessment | CPG 2.0, 11 Dec 2025 (v1 Oct 2022, update Mar 2023); adds a Govern group and merges IT and OT goals |
| SOC 2 (AICPA) | Attestation report by an independent CPA firm on a service organization’s controls, examined under the AICPA attestation standards (SSAE, AT-C sections 105 and 205) against the Trust Services Criteria. Security (the common criteria, CC1–CC9) is always in scope; Availability, Processing Integrity, Confidentiality and Privacy are added as chosen. | Service organizations, including colo and managed-service providers; voluntary, but customers and vendor-risk programs commonly ask for it | Attestation, not a certification. Type 1: description and design of controls as of a date. Type 2: adds the auditor’s opinion on operating effectiveness over a period, with tests and results. Restricted-use report: the auditor limits use to the provider, its customers and prospective customers, and their auditors who understand it. Providers usually also require an NDA. A SOC 3 is the general-use summary, with no test results. Verify | 2017 Trust Services Criteria with revised points of focus (2022); the criteria themselves were unchanged in 2022. The ASB exposed revisions to AT-C 105/205/210 in Feb 2026 (comments closed 30 Jun 2026); not final at last check. Type 2 periods are set by the provider and usually renewed yearly; a first Type 2 period is often shorter (3–6 months). Verify |
| HIPAA Security Rule (45 CFR 164 Subpart C) | Administrative, physical and technical safeguards for electronic protected health information; specifications are “required” or “addressable” | US covered entities and their business associates | No certification. Self-documented compliance; enforced by HHS OCR. | Current rule in force. Amendments proposed 6 Jan 2025 (90 FR 898, comments closed 7 Mar 2025); no final rule as of 6 Oct 2026; Unified Agenda lists final action 07/2027 under Long-Term Actions. Verify |
| PCI DSS v4.0.1 | Contractual security standard for payment account data | Entities that store, process or transmit cardholder data, or can affect its security, including service providers | Annual Report on Compliance by an assessor, or Self-Assessment Questionnaire, each with an Attestation of Compliance; brand and acquirer rules decide which | Published 11 Jun 2024; v4.0 retired 31 Dec 2024. Future-dated requirements mandatory since 31 Mar 2025. Request for Comments on the next iteration ran 3 Jun–20 Jul 2026. Verify |
| CMMC 2.0 with NIST SP 800-171 | DoD program verifying that contractors protect federal contract information (Level 1, FAR 52.204-21), CUI (Level 2, SP 800-171 Rev. 2) and CUI in priority programs (Level 3, selected SP 800-172) | US defense contractors and subcontractors handling FCI or CUI | Level 1 annual self-assessment; Level 2 self-assessment every 3 years; annual affirmations. Since 13 Jul 2026 solicitations may not designate Level 2 (C3PAO) or Level 3 (DIBCAC); voluntary C3PAO assessments continue. Verify | 32 CFR 170 effective 16 Dec 2024; 48 CFR rule effective 10 Nov 2025 (Phase 1). Phase 2 (planned 10 Nov 2026) suspended 13 Jul 2026; Phases 3–4 on hold. SP 800-171 Rev. 3 (May 2024) exists, but CMMC and DFARS 252.204-7012 still use Rev. 2. Verify |
Notes on fast-changing items
- CMMC. On 13 Jul 2026 DoD suspended the Phase 2 transition: solicitations may designate only Level 1 (Self) or Level 2 (Self), existing C3PAO and DIBCAC requirements are being removed, and further guidance was to follow a 60-day CIO review. SP 800-171 Rev. 2 and DFARS 252.204-7012 stay in effect (DoD CIO implementing memo). The review report had not been published at the last check. Verify
- SP 800-171 Rev. 3 vs Rev. 2. NIST published Rev. 3 in May 2024 (fewer, consolidated requirements in 17 families, with organization-defined parameters). DoD class deviation 2024-O0013 keeps DFARS 252.204-7012 on Rev. 2, and 32 CFR 170.14 names Rev. 2 for Level 2. Design to Rev. 2 IDs for CMMC; watch for a move to Rev. 3. Verify
- HIPAA. The proposed rule would remove the required/addressable distinction and require encryption of ePHI at rest and in transit, MFA, an asset inventory and network map reviewed every 12 months, network segmentation, restore of critical systems within 72 hours, vulnerability scans every six months, penetration tests every 12 months, and an annual compliance audit. None of this is in force. Verify
- PCI DSS. The future-dated requirements that bear on infrastructure (for example 3.5.1.2 on disk-level encryption, 10.4.1.1 automated log review, 10.7.2 control-failure detection for all entities, 12.3.1 targeted risk analysis) have been mandatory since 31 Mar 2025. A successor to v4.0.1 is in early consultation. Verify
Frameworks design / build / manage
Design
- Confirm which frameworks apply with counsel, your assessor or the contracting party, and record the version you design to (for example PCI DSS v4.0.1; SP 800-171 Rev. 2 for CMMC)
Build
- Use the IDs of the version in force, not a newer one that is not yet adopted (for example 800-171 Rev. 3 for CMMC)
Manage
- Track the items marked Verify (CMMC, HIPAA, PCI DSS, NIST) and update the requirements register when they land
Design mapping: what frameworks require of the DC
For each design area, the requirement or control IDs that apply, and the page that owns the implementation. This states what is required, not how to build it. IDs: ISO/IEC 27001:2022 Annex A; NIST SP 800-53 Rev. 5 (release 5.2.0); NIST SP 800-171 Rev. 2 (as used by CMMC Level 2); HIPAA 45 CFR 164; PCI DSS v4.0.1; SOC 2 Trust Services Criteria (2017, revised points of focus 2022; A1 and C1 apply only when Availability or Confidentiality is in scope). ISO control titles were checked against secondary lists only. Where a framework leaves a value to the organization (retention, test frequency), the cell says so. Sources checked 6 Oct 2026.
| Design area | ISO 27001 Annex A | NIST SP 800-53 / CSF | HIPAA | PCI DSS v4.0.1 | SOC 2 (TSC 2017) | CMMC L2 (800-171 R2) | Implemented on |
|---|---|---|---|---|---|---|---|
| Physical access control, logging and retention | 7.1, 7.2, 7.4 | PE-2, PE-3, PE-6, PE-8 (retention and review interval organization-defined); CSF PR.AA-06, DE.CM-02 | 164.310(a)(1); (a)(2)(iii) access control and validation (addressable) | 9.2.1; 9.2.1.1 camera and/or access-control data kept ≥ 3 months; 9.3.4 visitor log ≥ 3 months | CC6.4 physical access to facilities and protected assets | 3.10.1–3.10.5 (incl. 3.10.4 physical access logs) | Security: Physical · Zones · Video |
| Segmentation and scope reduction | 8.20, 8.22 | SC-7, SC-7(5) deny by default; CSF PR.IR-01; CPG 3.I | Not explicit in current rule; proposed rule adds network segmentation Verify | 1.2.1 NSC standards; 1.3.1–1.3.2 CDE inbound and outbound traffic limited to what is necessary; 11.4.5 segmentation pen test every 12 months and after changes (11.4.6: six months for service providers); 12.5.2 scope confirmed every 12 months | CC6.1 logical access security over protected assets (points of focus include network segmentation); CC6.6 protection against threats from outside the system boundary | 3.13.1, 3.13.5; asset categories and scope per 32 CFR 170.19 | Security: Segmentation · Policy model · OT |
| Encryption at rest and in transit, key management | 8.24 | SC-8, SC-12, SC-13, SC-28; CSF PR.DS-01, PR.DS-02; CPG 3.K | 164.312(a)(2)(iv), (e)(2)(ii), both addressable today; proposed rule would require encryption Verify | 3.5.1 PAN unreadable; 3.5.1.2 disk-level encryption only for removable media unless PAN is also protected another way; 3.6.1, 3.7.x key management; 4.2.1 strong crypto over public networks | CC6.1 (points of focus: encryption of data at rest, protection of encryption keys); CC6.7 restrict and protect information in transmission, movement or removal | 3.13.8, 3.13.10, 3.13.11 (FIPS-validated cryptography), 3.13.16 | Storage: Encryption · Security: Decryption policy · Security: Key management |
| Logging, time sync and retention | 8.15, 8.16, 8.17 | AU-2, AU-6, AU-8, AU-9, AU-11 (retention organization-defined), AU-12, SC-45; CSF PR.PS-04; CPG 3.Q | 164.312(b) audit controls; 164.308(a)(1)(ii)(D) activity review | 10.3.1–10.3.4 protect audit logs (read access by job need, no modification, prompt backup to a central log server, change detection on log data); 10.4.1.1 automated review; 10.5.1 ≥ 12 months, latest 3 months immediately available; 10.6.1 time sync; 10.7.2 control-failure alerts | CC7.2 monitor system components for anomalies; CC7.3 evaluate security events (retention set by the entity) | 3.3.1 create and retain audit logs (period organization-defined); 3.3.7 clock synchronization; 3.3.8 protect audit information and tools; 3.3.9 audit management limited to a subset of privileged users | Security: Log sources and volume · Security: Log retention and protection · Security: Time sync · Ops: Monitoring (review and alerting) |
| Backup and recovery testing | 8.13, 8.14, 5.30 | CP-4 (test frequency organization-defined), CP-9, CP-10; CSF PR.DS-11; CPG 3.O | 164.308(a)(7): backup plan and DR plan required; testing and revision addressable; proposed 72-hour restore Verify | 9.4.1.1 offline backup media in a secure location; 9.4.1.2 location reviewed every 12 months; 12.10.1 incident response plan | A1.2 environmental protections, backup processes and recovery infrastructure; A1.3 test recovery plan procedures; CC9.1 business-disruption risk | 3.8.9 protect backup CUI | Backup: Immutability · Restore testing · Retention |
| Change control | 8.32 | CM-2, CM-3, CM-4; CSF PR.PS-01, ID.RA-07; CPG 3.N | Not a named standard; covered by risk management and evaluation after changes (164.308(a)(8)) | 6.5.1 change control; 6.5.2 re-confirm PCI DSS controls after significant change | CC8.1 authorize, test, approve and implement changes to infrastructure, data and software | 3.4.3 track, review, approve and log changes | Ops: Change management · Security: Policy drift |
| Media sanitization and equipment disposal | 7.10, 7.14 | MP-6 (method per SP 800-88 Rev. 2) | 164.310(d)(2)(i) disposal and (ii) media re-use, both required | 9.4.6 hard copy; 9.4.7 electronic media destroyed or data made unrecoverable | CC6.5 discontinue protections over physical assets only after the ability to read or recover data is diminished and no longer needed; C1.2 dispose of confidential information | 3.8.3 sanitize or destroy before disposal or reuse | Disposal standard (Policies); custody on site exit (Security: Visitors and shipping) |
| Colo provider attestations | 5.19–5.22, 5.23 (cloud only) | SA-9; CA-6 inheritance; CSF GV.SC-05, GV.SC-07, DE.CM-06 | 164.308(b) business associate contracts where applicable Verify | 12.8.2 written agreements; 12.8.4 monitor TPSP PCI DSS compliance status every 12 months (for PCI: provider AOC, not a SOC 2); 12.8.5 responsibility split (12.9.x applies to the provider) | CC9.2 vendor and business partner risk; subservice organizations (carve-out or inclusive) in the provider’s report | ESP rules and customer responsibility matrix (32 CFR 170.19) | Facility: Colo evidence · Security: Onsite vs colo |
Where several frameworks apply, design to the strictest value in each row and record which requirement set it. For example, PCI DSS fixes minimums for log and access-record retention, while NIST SP 800-53 and SP 800-171 leave the period to the organization.
Mapping design / build / manage
Design
- Build a requirements register from the design mapping, with the strictest value per design area and the requirement that set it
- Hand the boundary to Security, log sources to Security: Log sources and volume, log retention to Security: Log retention and protection, access-record and video retention (PCI DSS 9.2.1.1, 9.3.4) to Security: PACS and Video, RPO/RTO and test cadence to Backup, and provider requirements to Facility
Build
- Run a pre-go-live control check against the requirements register and record the gaps as risks with owners (Risk management)
Manage
- Re-check rows with organization-defined values (retention, test frequency) after significant change
- Update the register when a framework change lands
Sources
All checked 6 Oct 2026. Government agencies, NIST and standards bodies are primary. ISO standards are paywalled; ISO facts come from ISO’s public pages and certification-body summaries. Research notes with per-claim detail are kept with the site source.
| Source | Type | Used for |
|---|---|---|
| ISO: ISO/IEC 27001:2022 | Primary (public abstract) | Edition and publication date; ISMS requirements |
| ISO: ISO/IEC 27001:2022/Amd 1:2024 | Primary (public abstract) | Climate action amendment |
| ISO: ISO/IEC 27002:2022 | Primary (public abstract) | Control guidance document |
| DQS: new Annex A of ISO/IEC 27001:2022 | Secondary (certification body) | 93 controls; counts per theme; new controls |
| NIST CSWP 29: CSF 2.0 (26 Feb 2024) | Primary | Functions, Govern categories and subcategory IDs, Tiers |
| NIST SP 800-53 Rev. 5 (release 5.2.0, Aug 2025) | Primary | Current release and changes; control IDs (checked in the NIST OSCAL catalog) |
| NIST SP 800-88 Rev. 2 (Sep 2025) | Primary | Media sanitization guideline |
| NIST SP 800-171 Rev. 3 (May 2024) | Primary | Rev. 3 publication and families |
| NIST SP 800-171 Rev. 2 | Primary | Requirement IDs used by CMMC Level 2 |
| CISA: Cross-Sector CPG 2.0 (Dec 2025) | Primary | Goals 1.A, 1.B, 2.A, 3.I, 3.N, 3.O, 3.Q; Govern group |
| eCFR: 45 CFR 164 Subpart C | Primary | Current HIPAA Security Rule standards and specifications |
| Federal Register: HIPAA Security Rule NPRM (90 FR 898, 6 Jan 2025) | Primary | Proposed amendments; comment period |
| Unified Agenda: RIN 0945-AA22 | Primary | HIPAA rule stage and target date |
| PCI SSC: PCI DSS v4.0.1 published (Jun 2024) | Primary | Version, v4.0 retirement, future-dated effective date |
| PCI SSC document library: PCI DSS v4.0.1 | Primary | Requirement text and IDs |
| PCI SSC: Request for Comments (Jun 2026) | Primary | Next-iteration consultation dates |
| AICPA: 2017 Trust Services Criteria (revised points of focus 2022) | Primary (free registration) | Current TSC version; criteria IDs |
| AICPA TSP section 100, March 2020 update (third-party hosted copy, Arpio) | Primary (AICPA text, third-party copy) | Criteria and points of focus actually read (CC1.2, CC1.3, CC6.1, CC6.5, A1.1); 2022 revision changed points of focus only |
| Journal of Accountancy: proposed revisions to AT-C 105, 205, 210 (May 2026) | AICPA publication (news) | Attestation standards exposure drafts and comment deadline |
| Schneider Downs: breakdown of a SOC 2 report (Jul 2024) | Secondary (CPA firm) | Report sections; carve-out vs inclusive; CUECs and CSOCs |
| Cyber Sierra: SOC 2 bridge letter explained | Secondary (vendor) | Bridge letter signed by management; usually covers up to about three months |
| Compass IT Compliance: choosing a SOC 2 Type 2 observation period | Secondary (audit firm) | First Type 2 periods often 3–6 months |
| Federal Register: CMMC Program rule (89 FR 83092, Oct 2024) | Primary | 32 CFR 170; effective date |
| Federal Register: DFARS CMMC rule (90 FR 43560, Sep 2025) | Primary | 48 CFR rule; Phase 1 start |
| eCFR: 32 CFR Part 170 | Primary | Phases (170.3), model and Rev. 2 reference (170.14), assessment frequency (170.15, 170.16), scoping and ESPs (170.19) |
| DoD CIO: Implementing suspension of CMMC Phase II (Jul 2026) | Primary | Phase 2 suspension; allowed designations; Rev. 2 baseline |
| Holland & Knight: DoW suspends CMMC Phase II (Jul 2026) | Secondary (law firm) | Phase I self-assessments still allowed during the suspension |
| Cyber AB: statement on Phase II suspension (15 Jul 2026) | Primary (accreditation body) | C3PAO Level 2 assessments remain available |
| Covington: CMMC Reform Task Force updates (Sep 2026) | Secondary (law firm) | Phases 3–4 on hold; task force report status |
| Clark Hill: DoD class deviation 2024-O0013 | Secondary (law firm) | DFARS 252.204-7012 held at SP 800-171 Rev. 2 |